FINA standard 51.5m x 25m x 3m deep main pool with a boom, therapy pools, a warm river therapy pool & a cold plunge & walk-through pool. The 50m pool included an enormous array of high-tech & state-of-the-art training aids, including force plates, camera systems, free-range floor cameras, concealed tracks, magnetic timing & underwater drag systems. Extremely high water quality to enhance the use of the camera systems was achieved in the water treatment systems designed.

Aquatic Centres
BEST – Blacktown Exercise Sports & Technology Hub
Project No. 7885 Location: BlacktownProject Type: Aquatics Structural EngineeringProject Status: CompletedAwards: • AIA Award for Interior Architecture 2024 • AIA Commendation for Educational






