Barker Street Carpark

#University of NSW Campus design & construct tender for A.W. Edwards are large 3 level post-tensioned car park decks supported on grout piles to rock. GNFP (BEC) also designed a single-level extension utilising carbon fibre reinforcement for strengthening existing post-tensioned beams.

Share this post:

Facebook
Twitter
LinkedIn
Aust - NSW

63 Minimbah Rd. Northbridge

Project No. 8022 Location: Northbridge, SydneyProject Type: Structural EngineeringProject Status: CompletedAwards: N/A Construction Period: 2.5 yearsProject Cost: ~$15 million 63 Minimbah Rd, also known as

Read More »
Award Winning

Africa Hall UNECA

Project No. 6332 Location: Addis Ababa, EthiopiaProject Type: Multidisciplinary – Structural, Civil, Mechanical, Hydraulic & Electrical Engineering DesignProject Status: Completed (as of October 2024) Awards:   

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Northam Recreation Centre

GNFP (BEC) Designed & constructed with Cooper Oxley. Extensive use of tilt-up panels. Integration of large cantilever timber trusses & steelwork for economic design to

Read More »

Oakhill Sports Centre

25m Indoor Aquatic Centre with steel box-section rafters, classrooms below two court multipurpose hall with precast seating & an extensive entry foyer.\

Read More »