Carrathool Pedestrian Bridge

Project No. 7264

Carrathool Shire Council appointed Built Environment Collective to provide concept design & engineers’ reporting suitable for funding submission for a new pedestrian bridge.

The proposed bridge will span 42m across the Lachlan River, and is intended to facilitate public access between Hillston Memorial Park and Desatholon Park, in Hillston NSW.

BEC conducted feasibility studies for 3 different design options, including a steel truss, cable stayed & timber deck, and cable stayed with CFT (Composite Fibre Technology) deck option.  Our reporting included comparative analysis on each options’ structural system, construction materials, & associated construction cost. An engineers’ recommendation rounded out our report, leaving Council informed & well positioned to source & secure funding.

Share this post:

Facebook
Twitter
LinkedIn
Aust - NSW

63 Minimbah Rd. Northbridge

Project No. 8022 Location: Northbridge, SydneyProject Type: Structural EngineeringProject Status: CompletedAwards: N/A Construction Period: 2.5 yearsProject Cost: ~$15 million 63 Minimbah Rd, also known as

Read More »
Award Winning

Africa Hall UNECA

Project No. 6332 Location: Addis Ababa, EthiopiaProject Type: Multidisciplinary – Structural, Civil, Mechanical, Hydraulic & Electrical Engineering DesignProject Status: Completed (as of October 2024) Awards:   

Read More »
Aquatic Centres

The WACA – Taking the Plunge

Project No. 7888 The Western Australia Cricket Association (WACA) Ground is undergoing an extensive redevelopment, transforming an iconic cricket ground into a vibrant, activated precinct

Read More »

Barker Street Carpark

University of NSW Campus design & construct tender for A.W. Edwards are large 3 level post-tensioned car park decks supported on grout piles to rock.

Read More »