United Petroleum, Umina

Project No: 6852 & 6619

Our United Umina project was completed in two stages as two different projects. For stage 1, our client was United Petroleum who we provided DA support and a site-based stormwater management plan for.  

We stepped in on the project again in stage two, this time we were contracted by the project’s builder and provided full detailed design.  The service station required more than the usual copy-and-paste canopy design due to the diagonal positioning on the fuel pumps; we instead employed steel truss framing for the canopy and a tailored design for the main building to suit its dual tenancy intention.

Share this post:

Facebook
Twitter
LinkedIn

Barker Street Carpark

University of NSW Campus design & construct tender for A.W. Edwards are large 3 level post-tensioned car park decks supported on grout piles to rock.

Read More »

Oakhill Sports Centre

25m Indoor Aquatic Centre with steel box-section rafters, classrooms below two court multipurpose hall with precast seating & an extensive entry foyer.\

Read More »

Danebank Anglican School

Indoor Aquatic Centre with 25m water polo & learn to swim pool featuring hipped roofs, Sciences & Arts building, library & multipurpose hall, all incorporating

Read More »

Tetra Pak Office

Purpose-built head office for Tetra Pak located at 1B Hill Road, Homebush. It also includes suspended concrete floors & a warehouse.

Read More »

Ford Product Development

A large testing & development facility with multiple overhead cranes, monorails underslung cranes, blast-proof engine testing facility & office 112,000m2 workshop & 3,600m2 offices.

Read More »