United Petroleum, Umina

Project No: 6852 & 6619

Our United Umina project was completed in two stages as two different projects. For stage 1, our client was United Petroleum who we provided DA support and a site-based stormwater management plan for.  

We stepped in on the project again in stage two, this time we were contracted by the project’s builder and provided full detailed design.  The service station required more than the usual copy-and-paste canopy design due to the diagonal positioning on the fuel pumps; we instead employed steel truss framing for the canopy and a tailored design for the main building to suit its dual tenancy intention.

United Petroleum, Wallace St, Warwick

Project No: 6958

BEC was commissioned to provide civil engineering consultancy for a fuel station on Wallace St, Warwick. The BE Collective scope of service covered the full operational works (Op Works) design and documentation as suitable for tender including:

  •   Car parking swept path and compliance to AS2890, including linemarking;
  •   Pavement & crossover;
  •   Stormwater drainage and management;
  •   Flood drainage channel works
  •   Site Bulk Earthworks;
  •   Roadworks, including new footpath and mountable kerb;
  •   Erosion and sediment control.

 

Sandgate Rd Flood Hazard Risk Review

Risk2Project No. 6524

The BE Collective team was recently commissioned to provide consultancy services regarding the identification and analysis of potential chemical related flood risks for a service station on Sandgate Road.

Through the use of a risk analysis chart we identified the key potential risk was the buoyancy of the underground fuel tanks. Considering the site was placed in a relatively flood prone area, the buoyant tanks presented a serious danger if water levels suddenly rose.

With this in mind we designed concrete sleepers which would counter the buoyancy of the tanks in the case of a flooding event, as well as providing solutions to the other problems identified. (more…)