Suncorp Stadium (Lang Park) DNC Roof Package

Secondment BE Collective director, John Tuxworth, to the steel fabrication and erection company for a 9-month period during the critical construction phases of this high-profile structure, with a capital cost of $15 million. Support included full design analysis of temporary works and erection including:

– 70+ design analysis cases
– analysis of large-form hollow-sections
– 140m long, 170 tonne lifts
– Site supervision

Share this post:

Facebook
Twitter
LinkedIn
Aust - NSW

63 Minimbah Rd. Northbridge

Project No. 8022 Location: Northbridge, SydneyProject Type: Structural EngineeringProject Status: CompletedAwards: N/A Construction Period: 2.5 yearsProject Cost: ~$15 million 63 Minimbah Rd, also known as

Read More »
Award Winning

Africa Hall UNECA

Project No. 6332 Location: Addis Ababa, EthiopiaProject Type: Multidisciplinary – Structural, Civil, Mechanical, Hydraulic & Electrical Engineering DesignProject Status: Completed (as of October 2024) Awards:   

Read More »
Aquatic Centres

The WACA – Taking the Plunge

Project No. 7888 The Western Australia Cricket Association (WACA) Ground is undergoing an extensive redevelopment, transforming an iconic cricket ground into a vibrant, activated precinct

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »