Secondment BE Collective director, John Tuxworth, to the steel fabrication and erection company for a 9-month period during the critical construction phases of this high-profile structure, with a capital cost of $15 million. Support included full design analysis of temporary works and erection including:
– 70+ design analysis cases
– analysis of large-form hollow-sections
– 140m long, 170 tonne lifts
– Site supervision