Suncorp Stadium (Lang Park) DNC Roof Package

Secondment BE Collective director, John Tuxworth, to the steel fabrication and erection company for a 9-month period during the critical construction phases of this high-profile structure, with a capital cost of $15 million. Support included full design analysis of temporary works and erection including:

– 70+ design analysis cases
– analysis of large-form hollow-sections
– 140m long, 170 tonne lifts
– Site supervision

Share this post:

Facebook
Twitter
LinkedIn

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Tetra Pak Office

Purpose-built head office for Tetra Pak located at 1B Hill Road, Homebush. It also includes suspended concrete floors & a warehouse.

Read More »

Ford Product Development

A large testing & development facility with multiple overhead cranes, monorails underslung cranes, blast-proof engine testing facility & office 112,000m2 workshop & 3,600m2 offices.

Read More »

Sony Music

This is a large span steel structure with suspended office & large plant room area for Sony Australia’s first CD & DVD manufacturing plant, 2

Read More »

Darwin Wave Pool

Darwin Waterfront cooperation hosts a large array of indoor & outdoor precincts including the project focus which was devised around the wave & recreation lagoons.

Read More »