Craigslea High School Canteen

Project No: 7081

BEC’s Craigslea High School project involved the demolition and extension of the existing school canteen alongside BSPN Arcitecture.  The BEC team provided structural design and documentation as well as construction phase support.

Following the demolition of the existing canteen and pavement slab, we undertook an inspection of the exposed roof structure and framing to assess how best to approach design of the extension bracing.  The new school canteen structure required full glazing on all three sides of the extension, which left minimal room for wall bracing.  To work around this, we braced the extension primarily through the rear wall where it met the existing structure and roof.

Share this post:

Facebook
Twitter
LinkedIn
Education

KSA Market Update

KSA Market Update As Saudi Arabia’s giga-projects & social infrastructure pipeline accelerates under Vision 2030, BEC is ready to deliver integrated PMC, engineering design, &

Read More »
Aust - NSW

63 Minimbah Rd. Northbridge

Project No. 8022 Location: Northbridge, SydneyProject Type: Structural EngineeringProject Status: CompletedAwards: N/A Construction Period: 2.5 yearsProject Cost: ~$15 million 63 Minimbah Rd, also known as

Read More »
Award Winning

Africa Hall UNECA

Project No. 6332 Location: Addis Ababa, EthiopiaProject Type: Multidisciplinary – Structural, Civil, Mechanical, Hydraulic & Electrical Engineering DesignProject Status: Completed (as of October 2024) Awards:   

Read More »