Green House Forensic

Project No. 6594

BE Collective was commissioned to investigate and report on the structural integrity of a suspended, cantilevered concrete pool, constructed as part of a beautiful architecturally designed home in Bardon.

Our investigations revealed significant defects in the application of the shot-crete used to create the reinforced concrete pool structure. Our reporting identified the type and magnitude of defects, addressed impact on serviceability and included rectification options. We found that unfortunately the structure was damaged beyond repair.  Our report was referenced and informed QCAT mediations.

 

Share this post:

Facebook
Twitter
LinkedIn

Up, Up and away!

A beautiful day onsite with IQconstruct. Their expert precision teamed with BEC’s multidisciplinary design, structural, civil, and building services.  

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

FiCK Brewing

Project no. 7188 The BE Collective team is excited to have worked on yet another brewery project. Recently featured in The Crafty Pint, our Client,

Read More »