We recently came on-board alongside Architect Tomas O’Malley to assist Macadamias Australia with a proposed two-storey industrial and commercial complex. The Bundaberg development includes a processing facility, office area, and tourism facility. Our team provided Energy Efficiency reporting which covered a preliminary design assessment, a detailed Deemed-to-Satisfy report, and Form 15 Energy Efficiency certification. We used the NCC glazing and lighting calculators to ensure compliance of glazing specifications and lighting energy use respectively. The facility’s façade is almost entirely glass, which made glazing for the western side particularly challenging. We also ensured that the wall/roof/ceiling insulation was adequate, and specified the mechanical services performance requirements (air conditioning, ventilation, security, etc.).

63 Minimbah Rd. Northbridge
Project No. 8022 Location: Northbridge, SydneyProject Type: Structural EngineeringProject Status: CompletedAwards: N/A Construction Period: 2.5 yearsProject Cost: ~$15 million 63 Minimbah Rd, also known as






