Macadamias Australia – New Facility

Project No: 7083

We recently came on-board alongside Architect Tomas O’Malley to assist Macadamias Australia with a proposed two-storey industrial and commercial complex. The Bundaberg development includes a processing facility, office area, and tourism facility.  Our team provided Energy Efficiency reporting which covered a preliminary design assessment, a detailed Deemed-to-Satisfy report, and Form 15 Energy Efficiency certification. We used the NCC glazing and lighting calculators to ensure compliance of glazing specifications and lighting energy use respectively. The facility’s façade is almost entirely glass, which made glazing for the western side particularly challenging.  We also ensured that the wall/roof/ceiling insulation was adequate, and specified the mechanical services performance requirements (air conditioning, ventilation, security, etc.).

Share this post:

Facebook
Twitter
LinkedIn
Aust - NSW

63 Minimbah Rd. Northbridge

Project No. 8022 Location: Northbridge, SydneyProject Type: Structural EngineeringProject Status: CompletedAwards: N/A Construction Period: 2.5 yearsProject Cost: ~$15 million 63 Minimbah Rd, also known as

Read More »
Award Winning

Africa Hall UNECA

Project No. 6332 Location: Addis Ababa, EthiopiaProject Type: Multidisciplinary – Structural, Civil, Mechanical, Hydraulic & Electrical Engineering DesignProject Status: Completed (as of October 2024) Awards:   

Read More »
Aquatic Centres

The WACA – Taking the Plunge

Project No. 7888 The Western Australia Cricket Association (WACA) Ground is undergoing an extensive redevelopment, transforming an iconic cricket ground into a vibrant, activated precinct

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »