Stannard Street Townhouses

Project No: 6633

The Stannard St project consisted of 18 townhouses built on a single suspended ‘floor’ over a floodplain. The suspended ground floor extends over most of the lot, forming a new ‘ground level’ upon which the townhouses are built.  A previous structural engineer had provided a design that was shown to be inadequate for the required loads, particularly in the driveway crossover which was only designed to carry light vehicles and would not allow commercial vehicles such as removalist trucks access.

A couple of the townhouses had been partly constructed, these had since showed water damage, and our investigation found that fire rating walls had been installed incorrectly. 

BE Collective was able to comprehensively identify these issues, and respond with cost and quality conscious solutions across the board, also managing to improve the constructability and estimated lifespan of the project.

Consequently BE Collective were commissioned to provide design and documentation services for the proposed changes and revisions.

Share this post:

Facebook
Twitter
LinkedIn
Aust - NSW

63 Minimbah Rd. Northbridge

Project No. 8022 Location: Northbridge, SydneyProject Type: Structural EngineeringProject Status: CompletedAwards: N/A Construction Period: 2.5 yearsProject Cost: ~$15 million 63 Minimbah Rd, also known as

Read More »
Award Winning

Africa Hall UNECA

Project No. 6332 Location: Addis Ababa, EthiopiaProject Type: Multidisciplinary – Structural, Civil, Mechanical, Hydraulic & Electrical Engineering DesignProject Status: Completed (as of October 2024) Awards:   

Read More »
Aquatic Centres

The WACA – Taking the Plunge

Project No. 7888 The Western Australia Cricket Association (WACA) Ground is undergoing an extensive redevelopment, transforming an iconic cricket ground into a vibrant, activated precinct

Read More »