Danebank Anglican School

Indoor Aquatic Centre with 25m water polo & learn to swim pool featuring hipped roofs, Sciences & Arts building, library & multipurpose hall, all incorporating a car park underneath. Each of these were major projects in themselves & were undertaken by GNFP (BEC) over a span of 8 years.

Share this post:

Facebook
Twitter
LinkedIn
Aust - NSW

63 Minimbah Rd. Northbridge

Project No. 8022 Location: Northbridge, SydneyProject Type: Structural EngineeringProject Status: CompletedAwards: N/A Construction Period: 2.5 yearsProject Cost: ~$15 million 63 Minimbah Rd, also known as

Read More »
Award Winning

Africa Hall UNECA

Project No. 6332 Location: Addis Ababa, EthiopiaProject Type: Multidisciplinary – Structural, Civil, Mechanical, Hydraulic & Electrical Engineering DesignProject Status: Completed (as of October 2024) Awards:   

Read More »
Aquatic Centres

The WACA – Taking the Plunge

Project No. 7888 The Western Australia Cricket Association (WACA) Ground is undergoing an extensive redevelopment, transforming an iconic cricket ground into a vibrant, activated precinct

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Northam Recreation Centre

GNFP (BEC) Designed & constructed with Cooper Oxley. Extensive use of tilt-up panels. Integration of large cantilever timber trusses & steelwork for economic design to

Read More »