Fletcher Parade, Bardon: Alterations & Additions

fletch

Project no. 6026

This Fletcher Parade home is of post war construction, with several alterations & additions over the years. Our structural contribution for the project was inspection, design & documentation to facilitate restumping, reconfiguration of the interior, and the addition of living spaces to the front & rear of the home.
 
Previous additions had left the plumbing & drainage for the home non compliant with BCC standards. The BE Collective team surveyed the existing, redesigned and documented the plumbing, drainage and structural works to be in compliance with the standards.
 

Share this post:

Facebook
Twitter
LinkedIn
Aust - NSW

63 Minimbah Rd. Northbridge

Project No. 8022 Location: Northbridge, SydneyProject Type: Structural EngineeringProject Status: CompletedAwards: N/A Construction Period: 2.5 yearsProject Cost: ~$15 million 63 Minimbah Rd, also known as

Read More »
Award Winning

Africa Hall UNECA

Project No. 6332 Location: Addis Ababa, EthiopiaProject Type: Multidisciplinary – Structural, Civil, Mechanical, Hydraulic & Electrical Engineering DesignProject Status: Completed (as of October 2024) Awards:   

Read More »
Aquatic Centres

The WACA – Taking the Plunge

Project No. 7888 The Western Australia Cricket Association (WACA) Ground is undergoing an extensive redevelopment, transforming an iconic cricket ground into a vibrant, activated precinct

Read More »