Hornsby Aquatic Centre

#Indoor Aquatic Centre including 50m, 25m Learners and Leisure pool with car parking beneath built over a steep embankment. Indoor 25m Learners and Leisure pool enclosed by structural steel tubular trussed roof. The entire building and pools are suspended over a 100 car space car park. 50m pool concourse cantilevered 3m over the embankment. Pool structure spans over 8m in each direction over car parking with up to 1m deep beams. Detailing of concrete pool structure to minimise shrinkage cracking through very substantial concrete pool wall sections over 1m thick. Extensive water testing of pool structures and pool concourses to ensure the waterproofness of the structure. The special detailing of water stops at structural expansion joints ensure the long-term waterproofness of the pools and concourses. All pools and gutters are membraned and tiled. Extensive use of precast beams and slabs to enable ease of construction of the car park, plant rooms and ramp entrance over the steep embankment. Ultra Fine Filtration filters are used for all pools. Onsite sodium hypochlorite generator used to eliminate traditional bulk delivery of sodium hypochlorite.

Share this post:

Facebook
Twitter
LinkedIn
Aust - NSW

63 Minimbah Rd. Northbridge

Project No. 8022 Location: Northbridge, SydneyProject Type: Structural EngineeringProject Status: CompletedAwards: N/A Construction Period: 2.5 yearsProject Cost: ~$15 million 63 Minimbah Rd, also known as

Read More »
Award Winning

Africa Hall UNECA

Project No. 6332 Location: Addis Ababa, EthiopiaProject Type: Multidisciplinary – Structural, Civil, Mechanical, Hydraulic & Electrical Engineering DesignProject Status: Completed (as of October 2024) Awards:   

Read More »
Aquatic Centres

The WACA – Taking the Plunge

Project No. 7888 The Western Australia Cricket Association (WACA) Ground is undergoing an extensive redevelopment, transforming an iconic cricket ground into a vibrant, activated precinct

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Northam Recreation Centre

GNFP (BEC) Designed & constructed with Cooper Oxley. Extensive use of tilt-up panels. Integration of large cantilever timber trusses & steelwork for economic design to

Read More »