Mendrisio, Townsville

men1This development comprises a retail development consisting of 6 separate structures totaling some 26,000m2. The facility is supported by some 680 car parks and internal roadways. Development optimisation considered incorporating the existing storage facility in an adjacent lot.

The BE Collective team had the privilage to assess this project prior to the land being purchased. We produced a report on engineering aspects associated with proposed vendor’s works, and development of the site to assist the client devise a development plan for the site.

Structurally, the project is a-typical with respect to steel-framed industrial structures/construction techniques. The building service component of this project is a relatively standard retail development.

Share this post:

Facebook
Twitter
LinkedIn

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Tetra Pak Office

Purpose-built head office for Tetra Pak located at 1B Hill Road, Homebush. It also includes suspended concrete floors & a warehouse.

Read More »

Ford Product Development

A large testing & development facility with multiple overhead cranes, monorails underslung cranes, blast-proof engine testing facility & office 112,000m2 workshop & 3,600m2 offices.

Read More »

Sony Music

This is a large span steel structure with suspended office & large plant room area for Sony Australia’s first CD & DVD manufacturing plant, 2

Read More »