Rum Fire Bar

rum1BE Collective were appointed as structural consultants for reconfiguration of the Rum Fire Bar in Sydney. The bar is in located in the ‘Hollywood’ inspired boulevards of Sydney’s Entertainment Precinct. The works included vertical circulation, floor trenching and other components typical of a hospitality reconfiguration. Our contribution was effectively an exhibition of ‘engineering by omission’ – with virtually all internal works disguised and refinished.

Share this post:

Facebook
Twitter
LinkedIn
Aquatic Centres

The WACA – Taking the Plunge

Project No. 7888 The Western Australia Cricket Association (WACA) Ground is undergoing an extensive redevelopment, transforming an iconic cricket ground into a vibrant, activated precinct

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Tetra Pak Office

Purpose-built head office for Tetra Pak located at 1B Hill Road, Homebush. It also includes suspended concrete floors & a warehouse.

Read More »

Ford Product Development

A large testing & development facility with multiple overhead cranes, monorails underslung cranes, blast-proof engine testing facility & office 112,000m2 workshop & 3,600m2 offices.

Read More »