Usana Sydney Head Office

#High tilt panel warehouse located in Castle Hill, NSW. Built using post-tensioned floor with no joints & large office facilities.

Share this post:

Facebook
Twitter
LinkedIn

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Northam Recreation Centre

GNFP (BEC) Designed & constructed with Cooper Oxley. Extensive use of tilt-up panels. Integration of large cantilever timber trusses & steelwork for economic design to

Read More »

Barker Street Carpark

University of NSW Campus design & construct tender for A.W. Edwards are large 3 level post-tensioned car park decks supported on grout piles to rock.

Read More »

Oakhill Sports Centre

25m Indoor Aquatic Centre with steel box-section rafters, classrooms below two court multipurpose hall with precast seating & an extensive entry foyer.\

Read More »

Danebank Anglican School

Indoor Aquatic Centre with 25m water polo & learn to swim pool featuring hipped roofs, Sciences & Arts building, library & multipurpose hall, all incorporating

Read More »

Tetra Pak Office

Purpose-built head office for Tetra Pak located at 1B Hill Road, Homebush. It also includes suspended concrete floors & a warehouse.

Read More »

Ford Product Development

A large testing & development facility with multiple overhead cranes, monorails underslung cranes, blast-proof engine testing facility & office 112,000m2 workshop & 3,600m2 offices.

Read More »