QUT D-Block Slab & Link Assessment

qut17

Project no. 5955

The purpose of this commission was to provide a structural assessment of the ‘as-built’ suspended slab on Level 4 D-block, and of the Level 4 Bridge-Link connecting D and R Blocks on Level 4 – in order to facilitate the temporary relocation of collection items during the proposed R-Block Library refurbishment.
A structural analysis of the ‘as built’ Bridge-Link and D-Block reinforced concrete floor element was performed to confirm current load capacity of the existing slab, and to provide advice as to the amount of additional load/collection which could be safely accommodated.
An on-site Non Destructive Testing with Ground Penetrating Radar (GPR) and local minor core drilling was also undertaken to validate the information provided by record drawings.
 

Share this post:

Facebook
Twitter
LinkedIn
Aquatic Centres

The WACA – Taking the Plunge

Project No. 7888 The Western Australia Cricket Association (WACA) Ground is undergoing an extensive redevelopment, transforming an iconic cricket ground into a vibrant, activated precinct

Read More »

Barker Street Carpark

University of NSW Campus design & construct tender for A.W. Edwards are large 3 level post-tensioned car park decks supported on grout piles to rock.

Read More »

Christian City Church

Located in Oxford Falls – the 1,500 seat Auditorium features a large tiled roof 42m x 42m supported by steel trusses. The building is supported

Read More »

FiCK Brewing

Project no. 7188 The BE Collective team is excited to have worked on yet another brewery project. Recently featured in The Crafty Pint, our Client,

Read More »