UQ Oral Health Centre, Herston

hers8

Project no. 6252

The new University of Queensland Oral Health Centre, is being incorporated into the Royal Women’s Hospital precinct at Herston. The multi-storey reinforced concrete structure is being built by Lend Lease,  who commissioned BE Collective to provide specialist advice relating to the Class of finish for off-form concrete surfaces with respect to AS 3610 Formwork for Concrete. Our John Tuxworth is considered one of a hand-full of  concrete specialists in Brisbane. We undertook forensic inspection of the sub-contractor’s works and identified non-compliant items in relation to face-step tolerance, formwork quality & reuse, propping, fixing and sealing…and even a work-glove cast intoa concrete slab. Our reporting informed contract negotiations.

Share this post:

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

FiCK Brewing

Project no. 7188 The BE Collective team is excited to have worked on yet another brewery project. Recently featured in The Crafty Pint, our Client,

Read More »