GNFP (BEC) oversaw an extensive upgrade of the existing aquatic centre, upgrades of existing 25m / diving/leisure pool with additional balance tanks, & new warm water indoor pool, Leisure pool & spa. New 25m x 10-lane outdoor pool. This project also included a new filtration plant for all pools using Ultra Fine Filtration filters.
Gold Coast Aquatic Centre
An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary