Coates Hire Depot – Kingston

BE Collective staff provided Project Management and Contract Administration services for the Design & Construct (D&C) Coates Hire Depot project at Kingston, adjacent to the Logan Motor way. The 60,000 m2 site is comprised of a combination of concrete and earthen hardstands with all stormwater draining to three separate bio-retention basins.

Two separate steel portal framed sheds were constructed to house the administrative functions and also repair workshops, wash bays and storage. Design was carefully managed in accordance with the Logan Council and exacting briefings with the Client, to create a functional fit-for-purpose design and built facility that will cope with expanding capacity over time.

Share this post:

Facebook
Twitter
LinkedIn
Aquatic Centres

The WACA – Taking the Plunge

Project No. 7888 The Western Australia Cricket Association (WACA) Ground is undergoing an extensive redevelopment, transforming an iconic cricket ground into a vibrant, activated precinct

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

FiCK Brewing

Project no. 7188 The BE Collective team is excited to have worked on yet another brewery project. Recently featured in The Crafty Pint, our Client,

Read More »