United Petroleum, Wallace St, Warwick

Project No: 6958

BEC was commissioned to provide civil engineering consultancy for a fuel station on Wallace St, Warwick. The BE Collective scope of service covered the full operational works (Op Works) design and documentation as suitable for tender including:

  •   Car parking swept path and compliance to AS2890, including linemarking;
  •   Pavement & crossover;
  •   Stormwater drainage and management;
  •   Flood drainage channel works
  •   Site Bulk Earthworks;
  •   Roadworks, including new footpath and mountable kerb;
  •   Erosion and sediment control.

 

Share this post:

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Tetra Pak Office

Purpose-built head office for Tetra Pak located at 1B Hill Road, Homebush. It also includes suspended concrete floors & a warehouse.

Read More »

Ford Product Development

A large testing & development facility with multiple overhead cranes, monorails underslung cranes, blast-proof engine testing facility & office 112,000m2 workshop & 3,600m2 offices.

Read More »

Sony Music

This is a large span steel structure with suspended office & large plant room area for Sony Australia’s first CD & DVD manufacturing plant, 2

Read More »