St Eugene’s College

20150804_121422Project No. 6320

The New Grade-7 building is the fifth building we have designed at St Eugene’s.

In order to accommodate the transition of the Grade-7 curriculum from primary to high school, St Eugene College commissioned BE Collective to provide structural services for a new building. The two-storey reinforced concrete building includes a steel roof, a small amphitheater and some attractive, raked, off-form columns.

The primary challenge was the design of a suspended ground-floor slab (to allow flood waters to flow beneath) supported on a deep-level foundations nested between a complex web of in-ground – including fire water, communications, electrics, storm water and sewer.

After some adjustments, the project was completed near the start of 2016 – in time for the school year.

Share this post:

Facebook
Twitter
LinkedIn

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

Barker Street Carpark

University of NSW Campus design & construct tender for A.W. Edwards are large 3 level post-tensioned car park decks supported on grout piles to rock.

Read More »

Christian City Church

Located in Oxford Falls – the 1,500 seat Auditorium features a large tiled roof 42m x 42m supported by steel trusses. The building is supported

Read More »

Gold Coast Aquatic Centre

An extensive upgrade of the existing Southport Aquatic Centre for the 2016 Commonwealth Games. Large podium post-tensioned slabs up to 110m long supporting extensive temporary

Read More »

FiCK Brewing

Project no. 7188 The BE Collective team is excited to have worked on yet another brewery project. Recently featured in The Crafty Pint, our Client,

Read More »