The BE Collective team have been engaged to provide structural consulting in support of this warehouse/showroom conversion into a new private medical centre. The original building was designed and constructed in 1989. The proposed fitout will house medical imaging equipment, including CT and MRI scanners of significant loads.

The building is between the Royal Brisbane Hospital and Enoggera Creek, and is founded on piles though several metres of alluvial soils. Both the ground and first/mezzanine floors are suspended, and required replacement and strengthening to accomodate the revised loads.

Zealous demolition resulted in damage to band beams at the ground floor level, and required concrete reinforcement to be exposed and repaired.

Fitout also required a new large circulation void at the mezzanine level. This necessitated modelling the full floor across multiple tenancies and strengthening of adjacent bays.

 

Share this post:

Facebook
Twitter
LinkedIn
Aquatic Centres

The WACA – Taking the Plunge

Project No. 7888 The Western Australia Cricket Association (WACA) Ground is undergoing an extensive redevelopment, transforming an iconic cricket ground into a vibrant, activated precinct

Read More »

Barker Street Carpark

University of NSW Campus design & construct tender for A.W. Edwards are large 3 level post-tensioned car park decks supported on grout piles to rock.

Read More »

Tetra Pak Office

Purpose-built head office for Tetra Pak located at 1B Hill Road, Homebush. It also includes suspended concrete floors & a warehouse.

Read More »

Ford Product Development

A large testing & development facility with multiple overhead cranes, monorails underslung cranes, blast-proof engine testing facility & office 112,000m2 workshop & 3,600m2 offices.